A.W. GibbsPortland, Oregon
Journal / Build log / Shop log

The Holly and the Iced Tea

Time19.0 h
Sessions21
Date Time Activity
2025-11-11 13:15 – 15:15 · 2h Milling the sides.
Marked edges to maintain 4-way grain wrap.
2025-11-11 21:15 – 22:15 · 1h Milled second set of sides; resawed veneer for front.
2025-11-13 1h 15min Cutting pieces for cracked ice front.
Rough bandsaw; shot to final size. Chevalet next time for multiples? Consider reshaping 13/14/16 to avoid common point.
2025-11-14 45 min Gluing up cracked ice veneers
Slow going.
2025-11-15 1h Continue gluing up front.
2025-11-15 1h Complete first veneer panel; start second.
2025-11-16 1h Thickness front. Miters on the sides.
2025-11-16 30 min Cut rabbet and dado in each side.
For bottom and dividers respectively.
2025-11-16 1h 30min Plywood base; interior dividers
2025-11-16 45 min Flushed sides to dividers; stock for caps.
2025-11-16 15 min Glue caps on sides.
2025-11-17 40 min Flushing caps; paring miters on caps.
2025-11-18 1h 15min Inlay metal into front
Titanium this time.
2025-11-19 30 min Make holly dust; apply mastic to gaps.
2025-11-20 45 min Sanding front to level mastic; polish metal lettering.
2025-11-23 1h Futz with fit on miters; recut base; veneer base.
I always forget how much I dislike miters.
2025-11-29 2h Prefinish cherry dividers; flush inside of holly sides; surface prep bottom; attach book cloth to bottom.
2025-11-30 11:20 – 12:00 · 40 min Prefinish inside.
2025-11-30 13:30 – 13:50 · 20 min First glue up.
2025-12-01 20 min Final glue up
2025-12-02 30 min Final finish and wax.
Fill with tea, and I'm done.