A.W. GibbsPortland, Oregon
Journal / Build log / Shop log

Puzzle Box #1

Time2.8 h
Sessions2
Date Time Activity
2026-07-11 2h Inlay satinwood ribbons in non-marquetry sides
Left everything a *bit* oversized and brought to perfect fit with sandpaper. Also note: added knife lines for where the ribbon should be then adjusted the ideal design from Origin with offsets to hit it.
2026-07-12 45 min Flush ribbon inlay; patch hole in marquetry face